Skip to content

Sample account

See what your portal looks like

This is a sample account, not real data. Example Property Group has five made-up buildings, each at a different stage of its Tier 2 filing, so you can see the whole journey: what the owner does, what we do, and where each filing stands. Click around and try the steps; nothing you do here is saved or sent.

Five buildings, five stages

Each sample building is at a different point of its filing. Open one to see that stage from the inside.

  1. 1Just addedExample Retail Center
  2. 2Gathering dataExample Medical Office
  3. 3QEM reviewExample Office Building
  4. 4Ready to signExample Business Park
  5. 5Filed with CommerceExample Warehouse

Example Medical Office: The owner signed and connected the utility account. Their HVAC company is sending the service report through a no-login link. A few questions are left, then the deposit.

Your portal · Example Property GroupSample, not real data

Example Medical Office

Collecting information

2200 Example Blvd, Bellevue, 98004 · parcel 0000002200

A no-login link for whoever is at the building to photograph the equipment on their phone, step by step. When they finish, the photos step is done.

Guided site capture

Send a link to whoever is in the building: your engineer, a janitor, a handyman. They don't need an account. It walks them through 5 short steps (rooftop units, air handlers and furnaces, boilers and water heaters, lighting and control panels, any other equipment) with one photo and a couple of fields each. They can stop and come back to the same link, and when they finish, the equipment photos step is done for you.

Each link opens this one building only, works for 14 days, and you can withdraw it any time.

Example Mechanical made Oct 28, 2026

Not opened yet

0 items added · sent to service@example.com

What your QEM checks

Before signing, the QEM checks every item Commerce requires against real evidence: a bill, a service record, a signed form. Green means the proof is on file; amber means it's the owner's word only so far; red means it's still missing.

11 with proof1 on the owner's word3 missing
  • Energy Manager named EMP 5.1.1, 5.3Missing
    No Energy Manager · On the form: 5.1.1, 5.3 left blank on CBPS 022 (no proof)
  • Monthly energy use tracked (12+ months) EMP 5.1.2.1, 5.2Proof on file
    Portfolio Manager property shared with Commerce · On the form: 5.1.2.1, 5.2 ticked on CBPS 022
  • Measured EUI from Portfolio Manager EMP 5.1.2.2Missing
    No measured EUI yet · On the form: 5.1.2.2 left blank on CBPS 022 (no proof)
  • Annual comparisons (N/A in the first year) EMP 5.1.2.3, 5.1.2.4Proof on file
    Marked N/A: first year of data · On the form: 5.1.2.3, 5.1.2.4 marked N/A on CBPS 022
  • Energy use intensity target set EMP EUItNot set
    Not saved yet: Commerce's tables give 59.3 for the owner's activities
  • O&M staff training EMP 5.1.2.9Proof on file
    Done by Example Mechanical (licensed service company) · On the form: 5.1.2.9 ticked on CBPS 022
  • Capital replacement plan (equipment ages) EMP 5.1.2.10Proof on file
    4 items with year · On the form: 5.1.2.10 ticked on CBPS 022
  • Contacts EMP 5.1.2.11Missing
    Owner details missing · On the form: 5.1.2.11 left blank on CBPS 022 (no proof)
  • Lighting schedule and survey EMP 5.1.2.12, 5.1.2.13Not required
    Not required for Tier 2 (WSR 26-15-112, Exception 3) · On the form: 5.1.2.12, 5.1.2.13 left blank on CBPS 022 (not required)
  • O&M program implemented EMP 5.1.2.14Proof on file
    Owner confirmed 2026-10-14; 0 maintenance record(s) from the last 12 months and 1 uploaded before we read records' dates, 0 dated task(s) on file · On the form: 5.1.2.14 ticked on CBPS 022
  • On-site generation answered EMP Section 1Proof on file
    Owner says none
  • Equipment inventory O&M L2.1Owner's word
    4 items, some typed in without a photo or record · On the form: L2.1 ticked on CBPS 023 on the owner's word
  • Who maintains what O&M L2.2Proof on file
    Example Mechanical, per their records · On the form: L2.2 ticked on CBPS 023
  • Tasks and how often O&M L2.2.2 to L2.2.4Proof on file
    4 tasks read from the service company's records · On the form: L2.2.2, L2.2.3, L2.2.4 ticked on CBPS 023
  • Records of maintenance done O&M L2.3Proof on file
    0 record(s) from the last 12 months and 1 uploaded before we read records' dates · On the form: L2.3 ticked on CBPS 023
  • Set points and schedules O&M 6.4.1Proof on file
    Both given · On the form: 6.4.1 ticked on CBPS 023
  • Program running before filing O&M ImplementationProof on file
    Owner confirmed 2026-10-14; 0 maintenance record(s) from the last 12 months and 1 uploaded before we read records' dates, 0 dated task(s) on file · On the form: 6.3 ticked on CBPS 023
The Energy Management Plan we wrote

Written by us, as the Energy Manager the owner named, from the owner's answers. Then reviewed by the QEM before anyone signs.

Energy Management Plan

1200 Example Ave, Seattle, 98101 - prepared 2026-10-30

1. Purpose

This Energy Management Plan (EMP) is for 1200 Example Ave, Seattle, 98101 (Commerce Building ID 000000), owned by Example Holdings LLC. It meets Section 5 of the Clean Buildings Performance Standard (WAC 194-50, Tier 2).

2. Building summary

Building: Example Office Building, 1200 Example Ave, Seattle, 98101. Gross floor area 34,000 sq ft excluding parking. Year built 1987.

Activity types: Office 32,000 sq ft (55 hours/week).

Energy metering and fuels: Seattle City Light electric, account 201023774; Puget Sound Energy natural gas, account 221025406.

Heating, ventilation and air conditioning: Rooftop packaged unit RTU-1 Carrier 10 tons (2014); Rooftop packaged unit RTU-2 Carrier 10 tons (2014).

Domestic hot water: Gas water heater A.O. Smith 100 gal (2018).

Controls: Programmable thermostats Honeywell (2019).

Building envelope: Brick or concrete walls, double-pane windows.

Lighting: Mostly LED.

Refrigeration: None.

Set points: 70°F heat, 75°F cool, setback at night.

Schedules: Mon-Fri 7am-6pm, Sat 9am-1pm.

On-site generation: none.

3. Energy Manager (5.1.1, 5.3)

Example Holdings LLC designates Tier Two Partners (Contractor) as Energy Manager to develop and maintain this plan.

The Energy Manager keeps the Portfolio Manager records current, compares energy use to the target each year, reviews the O&M program, reports to the owner, and gives occupants access to this plan each year.

4. Energy accounting and monitoring (5.1.2.1 to 5.1.2.4, 5.2)

Energy use for every fuel is recorded monthly in ENERGY STAR Portfolio Manager (property 00000000), from utility data feeds or bills, and shared with the Department of Commerce.

Energy use intensity target (EUIt): 59.3 kBtu/sq ft/yr. Each year the Energy Manager documents the net energy use, EUI and weather-normalized EUI, and compares them to the target.

Baseline (the 12 months reported on Form C): measured site EUI not yet reported; weather-normalized site EUI not yet reported.

UtilityFuelAccount
Seattle City Lightelectric201023774
Puget Sound Energynatural gas221025406

5. Tracking changes (5.1.2.5)

Baseline: about 140 occupants; schedules: Mon-Fri 7am-6pm, Sat 9am-1pm. The Energy Manager records changes in occupants, weekly operating hours, schedules and energy-using equipment that could change the EUI, with the date of each change.

6. Energy efficiency measures (5.1.2.6, 5.1.2.7)

No energy audit is required for Tier 2 and none was performed.

Measures already implemented in the last five years, as reported by the owner: LED lighting.

7. Occupant education (5.1.2.8)

Once a year, and when new tenants move in, the Energy Manager sends occupants a one-page guide: how to use thermostats and any operable windows, turning off lights and equipment when leaving, and who to call about comfort problems. A copy is kept with this plan.

8. O&M staff training (5.1.2.9)

Maintenance is performed by Example Mechanical. Staff or contractors are trained on the O&M program tasks, the control system schedules and set points, and the indoor comfort targets, when they start and when equipment changes.

9. Capital replacement plan (5.1.2.10)

When equipment fails or reaches the end of its life, it is replaced with ENERGY STAR or high-efficiency equipment meeting current federal, state and code requirements. Equipment at or past typical useful life:

  • None identified among equipment with a known age.

10. Contacts (5.1.2.11)

  • Building owner: Example Holdings LLC, pat@example.com
  • Energy Manager: Tier Two Partners
  • Maintenance: Example Mechanical
  • Compliance preparer: Tier Two Partners
  • Efficient-equipment suppliers and utility rebate programs: listed by the Energy Manager as they are used.

11. Lighting (5.1.2.12, 5.1.2.13)

Not required. WAC 194-50, Sections 5.1.2.12 and 5.1.2.13 as amended by WSR 26-15-112 (effective August 21, 2026), Exception 3: Tier 2 covered buildings.

12. Operations and maintenance (5.1.2.14)

The building's O&M program is a separate document (Section 6 and Annex L).

The owner confirmed on 2026-10-14 that this program is in place and being followed by Example Mechanical; the most recent recorded service was 2026-09-20.

13. Annual duties (5.1.3, 5.1.4)

  • The Energy Manager gives occupants and other stakeholders access to this plan every year.
  • The building owner reviews and signs this plan every year.
The operations and maintenance (O&M) program

Built from the owner's maintenance records and their service company's work. Commerce requires this program to already be running, not just written down, before a building can file.

Operations and Maintenance Program

1200 Example Ave, Seattle - eligible area 32,000 sq ft

1. Purpose and objectives (6.2, L2.2.1)

This Operations and Maintenance (O&M) program covers 1200 Example Ave, Seattle. It keeps building systems providing thermal and visual comfort, indoor air quality and energy efficiency over their service life.

Performance objectives: occupied space temperatures 70°F heat, 75°F cool, setback at night; ventilation per code during occupied hours; equipment off or set back outside occupied hours (Mon-Fri 7am-6pm, Sat 9am-1pm); energy use at or below the EUI target.

The owner confirmed on 2026-10-14 that this program is in place and being followed by Example Mechanical; the most recent recorded service was 2026-09-20.

2. Equipment inventory (L2.1)

SystemItemMake/modelYearSizeLocation
Heating, ventilation and air conditioningRooftop packaged unit RTU-1Carrier 48TC201410 tons, electricRoof
Heating, ventilation and air conditioningRooftop packaged unit RTU-2Carrier 48TC201410 tons, electricRoof
Domestic hot waterGas water heaterA.O. Smith BTH-1202018100 gal, natural gasMechanical room
ControlsProgrammable thermostatsHoneywell VisionPRO 80002019electricEach floor

3. Responsibilities (L2.2)

Maintenance is performed by Example Mechanical. The Energy Manager (Tier Two Partners) authorizes work, keeps the records, and reviews this program.

Current practice reported by the owner: Example Mechanical changes filters every quarter, services the rooftop units each spring and fall, and checks the water heater and thermostat schedules once a year.

4. Maintenance performed by Example Mechanical (6.3, L2.2.4)

These tasks are taken from the service provider's own maintenance records for this building. The category tables that follow add the remaining Annex L items and condition indicators.

EquipmentTaskFrequencyLast done
RTU-1, RTU-2Replace filtersQuarterly
RTU-1, RTU-2Check belts, clean condenser coils, check refrigerantSemi-annual
Water heaterFlush tank, check burner and relief valveAnnual
ThermostatsCheck occupied and unoccupied schedulesQuarterly

4.1 Heating, ventilation and air conditioning: tasks, frequencies, condition indicators (6.4.1, L2.2.2 to L2.2.4)

TaskFrequencyUnacceptable condition
Replace or clean air filtersQuarterlyFilter pressure drop above manufacturer limit, visible loading
Inspect belts, bearings, fans and motors; lubricate as requiredSemi-annuallyNoise, vibration, belt wear, high motor amps
Clean condenser and evaporator coils; check refrigerant chargeAnnuallyHigh head pressure, low capacity, frosting
Check economizer dampers and actuators for full travelSemi-annuallyDamper stuck or not modulating to outside air
Verify thermostat/controller schedules and set pointsQuarterlyUnit running outside occupied hours

4.2 Domestic hot water: tasks, frequencies, condition indicators (6.4.1, L2.2.2 to L2.2.4)

TaskFrequencyUnacceptable condition
Flush tank and inspect anodeAnnuallySediment, rumbling, reduced recovery
Verify storage and delivery temperature set pointsSemi-annuallyTemperature above or below set point
Inspect recirculation pump and controls/timerSemi-annuallyPump running 24/7 without need

4.3 Controls: tasks, frequencies, condition indicators (6.4.1, L2.2.2 to L2.2.4)

TaskFrequencyUnacceptable condition
Review schedules, set points and overrides; remove stale overridesQuarterlyEquipment on outside schedule, manual overrides left on
Calibrate key sensors (space, supply air, outside air)AnnuallySensor reading differs from reference by more than 2°F

4.4 Building envelope: tasks, frequencies, condition indicators (6.4.1, L2.2.2 to L2.2.4)

TaskFrequencyUnacceptable condition
Inspect doors, windows and weatherstripping; repair air leaksAnnuallyDrafts, damaged seals, doors not closing
Inspect roof and insulation for damage or moistureAnnuallyWet insulation, roof membrane damage

4.5 Lighting: tasks, frequencies, condition indicators (6.4.1, L2.2.2 to L2.2.4)

TaskFrequencyUnacceptable condition
Check occupancy sensors, photocells and time clocksSemi-annuallyLights on in unoccupied spaces or daytime
Replace failed lamps/drivers with equal or more efficient productsAs neededFailed or flickering fixtures

5. Access, changes and tenant improvements (6.4.2, 6.4.3, 6.5)

  • Safe and reasonable access is kept to all listed equipment for inspection, maintenance and repair.
  • This program is re-evaluated when the building's use changes or renovations affect its operation.
  • Tenant improvements that change space use or move partitions are reviewed by the Energy Manager so they don't raise net energy use beyond what the change in target allows.

6. Replacement policy (6.6)

  • Replacement HVAC, water heating, refrigeration equipment and appliances meet the most stringent efficiency requirements of federal and state equipment standards and the building code.
  • Replacement lighting meets the same requirements and does not increase installed lighting power unless light levels are below IES recommendations.

7. Documentation and tracking (L2.2.5, L2.3)

  • Each completed task is logged with the date, who did it, what was found and what was done, in the maintenance log kept with this program (paper or electronic).
  • Equipment past its useful life is flagged in the inventory.
  • If an unacceptable condition is found on two consecutive inspections, the owner or Energy Manager investigates the cause.
  • Emergency contacts and shut-off procedures are posted in the mechanical room and kept with this program.

8. Revisions (L2.4)

This program is reviewed and revised when the building or its use changes in a way that affects system performance, when components change, when a system can't meet its objectives, or when the maintenance provider recommends it.

Ready to see your own buildings here?

Adding a building is free and shows its incentive estimate (EST.) right away. Nothing is charged until its information is in.